thumbnail image
021391588
ivy.candbdrainage2017@gmail.com

C&B Drainage Contracting Ltd

  • About Us
  • Services
  • Projects
  • Contact Us
  • CCTV-inspection-reporting
  • Public Stormwater Infrastructue
  • Public Wastewater Infrastructue
  • Directional Drilling
  • Watermain Installation
  • Private Drainage System
  • C&B Updates
  • …  
    • About Us
    • Services
    • Projects
    • Contact Us
    • CCTV-inspection-reporting
    • Public Stormwater Infrastructue
    • Public Wastewater Infrastructue
    • Directional Drilling
    • Watermain Installation
    • Private Drainage System
    • C&B Updates
021 391 588
021391588
ivy.candbdrainage2017@gmail.com

C&B Drainage Contracting Ltd

  • About Us
  • Services
  • Projects
  • Contact Us
  • CCTV-inspection-reporting
  • Public Stormwater Infrastructue
  • Public Wastewater Infrastructue
  • Directional Drilling
  • Watermain Installation
  • Private Drainage System
  • C&B Updates
  • …  
    • About Us
    • Services
    • Projects
    • Contact Us
    • CCTV-inspection-reporting
    • Public Stormwater Infrastructue
    • Public Wastewater Infrastructue
    • Directional Drilling
    • Watermain Installation
    • Private Drainage System
    • C&B Updates
021 391 588
  • Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1

    Public Stormwater, Wastewater & Watermain Infrastructure

    C&B Drainage Contracting Ltd completed the first stage of a 15-lot farm subdivision on Wicklam Lane, Greenhithe in 2021. We delivered the public stormwater and wastewater infrastructure for the development, including approximately 15 manholes, road crossings, pipe installation and property connections.

    The works were carried out using both open-cut excavation and directional drilling, including approximately 120m of directional drilling for stormwater and wastewater crossings. We also installed more than 200m of internal stormwater concrete pipework, with manholes and outlet structures connecting towards the surrounding bush area.

    The project was completed over approximately four months, including traffic management, road reinstatement and asphalt repairs. All works were successfully completed, tested and signed off with Watercare and Auckland Council.

    Stormwater MH installation

    Stormwater MH installation

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Directional Drilling

    Excavation of Manhole

    Excavation of Manhole

    Install the PE pipe

    Install the PE pipe

    Preparation of work

    Preparation of work

    Property Connection

    Property Connection

    Excavation of work

    Excavation of work

    Install the PE pipe

    Install the PE pipe

    Install the PE pipe

    Install the PE pipe

     Stormwater MH installation

    Stormwater MH installation

    Stormwater MH installation

    Stormwater MH installation

    Wastewater MH installation

    Wastewater MH installation

    Open-Cut Excavation

    Open-Cut Excavation

    Drainage work in progress

    Drainage work in progress

    Wastewater MH installation

    Wastewater MH installation

    Sewer pump connection

    Sewer pump connection

    Sewer pump connection

    Sewer pump connection

    Concrete pipe installation

    Concrete pipe installation

    Excavation of pipe Trench

    Excavation of pipe Trench

    Watermain PE pipe installation

    Watermain PE pipe installation

    Watermain PE pipe installation

    Watermain PE pipe installation

    Fire Hydrant installation

    Fire Hydrant installation

    Fire Hydrant & Valve install

    Fire Hydrant & Valve install

    Fire Hydrant & Valve install

    Fire Hydrant & Valve install

    Watermain welding part

    Watermain welding part

    Watermain Pressure test

    Watermain Pressure test

    Road Reinstatement

    Road Reinstatement

    Drainage work finishing

    Drainage work finishing

©2026 - Proudly built with C&B Drainage Contracting Ltd

    Home
    Posts
    Find Us
    Contact
Cookie Use
We use cookies to ensure a smooth browsing experience. By continuing we assume you accept the use of cookies.
Learn More