
C&B Drainage Contracting Ltd
- …
C&B Drainage Contracting Ltd
- …
9-Lot Subdivision Drainage – Ti Rakau Drive, Pakuranga Drainage Works
Public Stormwater & Wastewater Works on a Busy Arterial Road
C&B Drainage Contracting completed public stormwater and wastewater works for a 9-lot residential subdivision on Ti Rakau Drive, Pakuranga. The project was located on a busy arterial road and required extensive traffic management and three weeks of night works from 9pm to 5am. Due to the restricted working conditions, both stormwater and wastewater pipelines were installed by full open-cut excavation along the footpath, with approximately 25m of each service. Night-time visibility and working within a live traffic environment added significant challenges to the project. Works were completed in early 2026.
Related Projects of Drainage works
Blockhouse Bay – 5-Lot Residential Subdivision
Birkenhead – 8-Lot Subdivision & Directional Drilling
Ti Rakau Drive, Pakuranga - 9-Lot Residential Subdivision
Northshore | 5-Lot Residential Subdivision Drainage Works
Woodglen, Glen Eden | 61-Lot Residential Subdivision
West Harbour | Deep Public Drainage Infrastructure Works
14 Diana Dr, Glenfield | 20-Lot Residential Development
Arabi St, Sandringham | 10-Lot Residential Development
32 Lavery Place, Sunnynook | 4-Lot Residential Subdivision
New Windsor | Public Stormwater Pipe Replacement
New North Road | 4 Lot Residential Subdivision
Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1
Related Projects of Drainage works
Blockhouse Bay – 5-Lot Residential Subdivision
Birkenhead – 8-Lot Subdivision & Directional Drilling
Ti Rakau Drive, Pakuranga - 9-Lot Residential Subdivision
Northshore | 5-Lot Residential Subdivision Drainage Works
Woodglen, Glen Eden | 61-Lot Residential Subdivision
West Harbour | Deep Public Drainage Infrastructure Works
14 Diana Dr, Glenfield | 20-Lot Residential Development
Arabi St, Sandringham | 10-Lot Residential Development
32 Lavery Place, Sunnynook | 4-Lot Residential Subdivision
New Windsor | Public Stormwater Pipe Replacement
New North Road | 4 Lot Residential Subdivision
Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1
©2026 - Proudly built with C&B Drainage Contracting Ltd






























