• Project Scope

    The project involved 110m of directional drilling beneath the public footpath to install a 280mm PE stormwater pipeline at approximately 4 metres deep. The new pipeline was connected to an existing 650mm public stormwater main. Works were carried out in a constrained residential environment, with careful consideration of existing underground services, site access, and Auckland Council and Watercare requirements.

  • Related Projects of Drainage works

    Blockhouse Bay – 5-Lot Residential Subdivision

    Birkenhead – 8-Lot Subdivision & Directional Drilling

    Ti Rakau Drive, Pakuranga - 9-Lot Residential Subdivision

    Northshore | 5-Lot Residential Subdivision Drainage Works

    Woodglen, Glen Eden | 61-Lot Residential Subdivision

    West Harbour | Deep Public Drainage Infrastructure Works

    14 Diana Dr, Glenfield | 20-Lot Residential Development

    Arabi St, Sandringham | 10-Lot Residential Development

    32 Lavery Place, Sunnynook | 4-Lot Residential Subdivision

    New Windsor | Public Stormwater Pipe Replacement

    New North Road | 4 Lot Residential Subdivision

    Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1