• Project Scope

    C&B Drainage Contracting Ltd completed a combination of public and private stormwater and wastewater drainage works for this steep-site residential development. The public stormwater scope included approximately 70m of 225mm PE SDR11 pipe installed by directional drilling outside the site boundary. Within the site, approximately 36m of 180mm PE SDR11 pipe was installed by directional drilling for both stormwater and wastewater, including three 100mm electrofusion-welded saddle connections for each service.

    The works were carried out in very soft ground conditions with a steep site profile and restricted working space. Ongoing geotechnical monitoring of neighbouring properties was maintained throughout the works, requiring careful planning, drilling control and coordination to safely complete the installation.

  • Related Projects of Drainage works

    Blockhouse Bay – 5-Lot Residential Subdivision

    Birkenhead – 8-Lot Subdivision & Directional Drilling

    Ti Rakau Drive, Pakuranga - 9-Lot Residential Subdivision

    Northshore | 5-Lot Residential Subdivision Drainage Works

    Woodglen, Glen Eden | 61-Lot Residential Subdivision

    West Harbour | Deep Public Drainage Infrastructure Works

    14 Diana Dr, Glenfield | 20-Lot Residential Development

    Arabi St, Sandringham | 10-Lot Residential Development

    32 Lavery Place, Sunnynook | 4-Lot Residential Subdivision

    New Windsor | Public Stormwater Pipe Replacement

    New North Road | 4 Lot Residential Subdivision

    Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1