• Project Scope

    The drainage scope included the installation of public stormwater and wastewater pipelines, together with multiple manholes across the development. Due to the consistently deep excavation depths of approximately 4–5 metres, trench shoring was required throughout the site. C&B Drainage managed the excavation, shoring, pipe installation and manhole construction as an integrated operation, with careful attention to ground stability, access and safe working conditions.

  • Related Projects of Drainage works

    Blockhouse Bay – 5-Lot Residential Subdivision

    Birkenhead – 8-Lot Subdivision & Directional Drilling

    Ti Rakau Drive, Pakuranga - 9-Lot Residential Subdivision

    Northshore | 5-Lot Residential Subdivision Drainage Works

    Woodglen, Glen Eden | 61-Lot Residential Subdivision

    West Harbour | Deep Public Drainage Infrastructure Works

    14 Diana Dr, Glenfield | 20-Lot Residential Development

    Arabi St, Sandringham | 10-Lot Residential Development

    32 Lavery Place, Sunnynook | 4-Lot Residential Subdivision

    New Windsor | Public Stormwater Pipe Replacement

    New North Road | 4 Lot Residential Subdivision

    Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1