• Project Scope

    • Public stormwater infrastructure using 225mm concrete pipe
    • 100mm saddle connections for stormwater connections
    • Public wastewater infrastructure using 150mm uPVC SN16 pipe
    • 150/100mm Y-junction connections for wastewater connections
    • Public watermain infrastructure installation
    • Drainage infrastructure supporting the 10 terrace houses and 10 apartments
    • Pipe installation and associated connections
    • Coordination of works across different residential areas
    • Construction completed to relevant Auckland Council and Watercare requirements