3 Summit Drive, Torbay – 3-Lot Residential Subdivision
Completed November 2026 | Public Stormwater, Wastewater & Watermain Infrastructure
C&B Drainage Contracting Ltd completed the public stormwater, wastewater and watermain infrastructure works for a three-lot residential subdivision at 3 Summit Drive, Torbay, in October 2026.
The project involved a 225mm concrete stormwater pipe crossing the road diagonally, connecting to an existing 300mm concrete stormwater pipeline and manhole on the opposite side. A separate wastewater connection was installed in another trench, connecting to an existing 150mm AC pipe. Both connections served Lots 1–3.
The restricted driveway beside the existing house, congested underground services, stepped excavation requirements and strict Auckland Transport and Council inspection and road reinstatement standards made the boundary-outside works particularly challenging. The entire project was successfully completed over three weeks.
Project Scope
We completed public stormwater, wastewater and watermain infrastructure for this 3-lot residential subdivision in Torbay. The works included a 225mm concrete stormwater pipeline crossing the road diagonally and connecting to an existing 300mm concrete stormwater pipe and manhole on the opposite side. A separate wastewater trench connected to an existing 150mm AC pipe, with both connections serving Lots 1–3.
Site Challenges
The work was carried out in a restricted driveway area beside an existing house, leaving limited space for excavation and site operations. The boundary-outside works involved crossing the road and working around numerous existing underground services, including high-voltage cables, power, gas and telecommunications.
The stormwater road crossing was the most challenging part of the project. Auckland Transport and Council requirements were strict, with inspections at each stage and geotechnical reports required throughout the works. Excavation also had to be completed in a stepped formation to meet geotechnical requirements.
Construction Approach
We carefully planned and progressed the works around the existing underground services and restricted site access. The excavation was carried out in stages, following the required stepped formation and geotechnical inspection process. Our team coordinated the stormwater road crossing, the separate wastewater connection and the associated infrastructure works, while meeting the required inspection and road reinstatement standards.
Project Completion
The project took three weeks to complete. We successfully delivered the public stormwater, wastewater and watermain works, including the road crossing and connections to the existing networks. Despite the restricted working space, congested underground services and demanding inspection and reinstatement requirements, the project was completed successfully.
Related Projects of Drainage works
Blockhouse Bay – 5-Lot Residential Subdivision
Birkenhead – 8-Lot Subdivision & Directional Drilling
Ti Rakau Drive, Pakuranga - 9-Lot Residential Subdivision
Northshore | 5-Lot Residential Subdivision Drainage Works
Woodglen, Glen Eden | 61-Lot Residential Subdivision
West Harbour | Deep Public Drainage Infrastructure Works
14 Diana Dr, Glenfield | 20-Lot Residential Development
Arabi St, Sandringham | 10-Lot Residential Development
32 Lavery Place, Sunnynook | 4-Lot Residential Subdivision
New Windsor | Public Stormwater Pipe Replacement
New North Road | 4 Lot Residential Subdivision
Wicklam Lane, Greenhithe | 15-Lot Farm Subdivision – Stage 1
4 Emirau Place, Glenfield – 5-Lot Residential Subdivision
3 Summit Drive, Torbay – 3-Lot Residential Subdivision
©2026 - Proudly built with C&B Drainage Contracting Ltd